Scope and type of work
130 m2
location
Priluki 2017
The location of the Head’s area rooms along three light facades and the elongated reception room along the side wall created a problem of natural light in the central part of the room.
There was also a need to arrange a separate room for a rest room for employees with separate engineering systems.
Thank you for submitting your application. The manager will contact you shortly.